Progress to Date
- 11/2006 - Piping order was placed.
- 1/2007 to 2/2007 - Bending,
cutting, and welding is performed by senior design and club members.
- 2/2007 to Present - Moving parts
from the old frame to the new frame and continuing to weld tabs and
other supporting hardware (pictures below). In addition to the
actual construction, a COSMOS stress analysis is currently underway.
Frame after
welding
Frame after
painting
Frame with
front components installed
|